|
|||||||||||||||||||||||||||||
Wirtz Dam
Texas, 1999
Project Goal: Dam Renovation and Seismic Upgrade. |
|||||||||||||||||||||||||||||
|
CTS Products: 78 Strand anchors, Class I corrosion protected, 28 strands each, epoxy coated Flo-Fil, Flo-Bond Stressing and testing equipment Uncoilers CTS Services: Job site technical assistance |
|
|||||||||||||||||||||||||||
| Drilling of anchor holes in the spillway, lock stop in place and gate open (top). Anchor testing and stressing (below). |
|||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||
![]() |
Project Information Owner: Lower Colorado River Authority (L.C.R.A.), Austin, Texas Contractor: Layne Christensen Geotechnical Construction Division, Salt Lake City, UT Engineering: Freeze & Nichols, Austin Texas |
||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
|
Con-Tech Systems 8150 River Road Delta, B.C. V4G 1B5 February 28, 2001 |
|||||||||||||||||||||||||||||