|
||||||||||||||||||||
Stave Falls Dam
British Columbia
First CTS Project, 1985.
Project Goal: Dam Renovation and Seismic Upgrade. |
||||||||||||||||||||
CTS Products: Strand anchors, Class I corrosion protected, 19 strand Stressing and testing equipment CTS Services: Jobsite technical assistance |
|
|||||||||||||||||||
|
Job site anchor assembly by CTS due to limited access (top). Anchor installation (left). |
|||||||||||||||||||
| Project Information Owner: BC Hydro, B.C. Contractor: Beck Construction, Calgary, Alta.. |
||||||||||||||||||||
|
Con-Tech Systems 8150 River Road Delta, B.C. V4G 1B5 February 28, 2001 |
||||||||||||||||||||