Projects -> Soil Nails

 

Provo Canyon, Utah

Titan 40/16 without additional corrosion protection, allowance for sacrificial steel (Titan 40/20 would have been sufficient for the required force), app. 90,000 lf.

Owner: UDOT and FHWA, Contractor: Obayashi

 

Highway 92

R38 and Titan 40/16 with purple epoxy coating to ASTM A-934

Caltrans Project 04-103584, Contractor: Drilltech

 

Highway I-15

R38 and Titan 40/16

Owner Caltrans, Contractor: Wagner Construction

 

Visalia

Titan 30/11 with purple epoxy coating to ASTM A-934

Caltrans Project 06-278614, Contractor: Drilltech.

 

Route 18

Titan 40/20 with purple epoxy coating to ASTM A-934

Caltrans Project 08-080003, Contractor: Drilltech.

 

Deercrest near Park City

Titan R32/20, no additional corrosion protection, allowance for sacrificial steel, over 100,000 lf

Contractor: Becho

 

Wolf Creek Project

Titan 30 and 40

FHWA UTAH, Contractor: Drilltech

 

ADOT Tuscon Arizona River Road project

Titan 40 and 30 with purple epoxy coating to ASTM A-934, 40,000 lf

Contractor: Malcolm Drilling Co, Inc.

 

Seattle Library, SeattleWA

TITAN 40/20 & 40/16

Owner: City of Surrey
Contractor: Drill tech

 

Brigham Apartments, Salt Lake City, Utah

Owner: LDS Church
Contractor: Becho

 

San Bernadino

Contractor: Drill-tech

 

I-10/210 Los Angeles, CA

#8 & #9 Solid Bars with purple epoxy coating and DCP

Owner: CALTRANS
Contractor: Drill Tech

 

Jenner, CA

26mm, 32mm & 35mm grde 150 Solid Bars with purple epoxy coating and DCP

Owner: CALTRANS
Contractor: Drill Tech

 