Seymour Falls Dam

Seymour Falls Dam Vancouver, British Columbia CDN

30 Tie Down Anchors: 26 Strand, Wax Encapsulated Extruded Strand

Owner: GVWD (Greated Vancouver Water District)
Engineers: Acres International Ltd.
Contractor: Peter Kiewit & Sons

 

Little Quinnesel Falls Hydro Electric Plant Penstock, Niagara Wisconsin

Epoxy Coated Flo-Fill-Bond Strand, 6 Tie Down Anchors: 14 Strands, 5 Tie Down Anchors: 19 Strands, 77 feet long

Owner: Consolidated Paper Inc., Niagara WI
Engineers: Harza Engineering
Contractor: Layne Christensen

Tom Miller Dam - Stich Anchor Installation

Tom Miller Dam, Texas USA

55 Tie Down Strand Anchors:18 Strands (in Dam) & Stitch Anchors in Spillway: CTS/TITAN IBO™ 40/16

Owner: LCRA (Lower Colorado River Authority)
Engineer: Freese and Nichols
Contractor: Nicholson Construction

Seven Mile Dam

Seven Mile Dam, BC Canada

57 Tie Down Strand Anchors: 92 Strands, up to 415 ft long, Wax Encapsulated Extruded Strand, 2000 Ton Restressing System for Future Load Monitoring

Owner & Engineer: BC Hydro,
Contractor: Peter Kiewit & Sons

 

Stave Falls Dam, BC Canada

30 Tie Down Strand Anchors: 19 Strands, 90 ft, first CTS Dam Strand Anchors (1985)

Owner & Engineer: BC Hydro, Contractor: Beck Drilling

Point du Bois Dam

Point du Bois Dam, Manitoba Canada

6 Tie Down Strand Anchors in Sluice Way: 12 Strands, 80 ft

Owner: Manitoba Hydro, Engineer: KGS Consultants
Contractor: Arneson Construction

Point du Bois Dam Power House

Point du Bois Dam Power House, Manitoba Canada

48 Tie Down Strand Anchors: 18 Strands, 105 ft, Restressable, Monitored with SMS Gauges and Load Cells

Owner: Manitoba Hydro, Engineer: KGS Consultants
Contractor: Underground Services

Pardee Dam

Pardee Dam, California USA

Epoxy Coated Flo-Fill-Bond Strand 48 Tie Down Anchors: 18 Epoxy Coated Strands plus DCP, 160ft, Monitored with Load Cells

Owner: East Bat M.U.D., Engineer: Woodward Clyde Consultants, Contractor: Malcolm Drilling Co. Inc

 

Mamquam River Dam, Squamish, BC Canada

25 Tie Down Strand Anchors: 7 Strands

Engineer: KGS Consultants, Contractor: Peter Kiewit Co.

Tolt River Intake Tower

Tolt River Dam Intake Tower, WA USA

Epoxy Coated Flo-Fill-Bond Strand 6 Tie Down Anchors: 60 Strands, 300 ft, Monitored with Load Cells

Owner: City of Seattle
Engineer: Woodward Clyde
Contractor: Layne Christensen Co.

Rapides des Quinze

Rapides des Quinze Dam, Quebec Canada

18 Anchors: 15 Strands

Owner: Quebec Hydro, Engineer: Lavalin Consultants

Wirtz Dam

Wirtz Dam, Marble Falls Texas USA

Epoxy Coated Flo-Fill-Bond Strand, 78 Tie Down Anchors: 27 Strands, 58-148 feet long

Owner: LCRA (Lower Colorado River Authority)
Engineer: Freese and Nichols
Contractor: Layne Christensen Co.

 

East Side Reservoir Intake Tower, near Hemmet CA

28 Tie Back Anchors: 32 Strands, Restressable, Monitored with Load Cells

Owner: Los Angeles Water District
Contractor: Avar Construction

 

Hollingworth and Gartshore Dams, Ontario Canada

6 Tie Down Anchors: 11 & 24 Strands

Owner: Great Lakes Power, Contractor: Geo-Foundations

 

Pine Falls Dam, Manitoba Canada

39 Tie Down Anchors: 5 Strands

Owner: Manitoba Hydro, Contractor: Geo-Foundations

Keenleyside Dam

Keenleyside Dam, Britisch Columbia BC

14 Tie Down Anchors: 37 Strands

Owner: Columbia Basin Trust BC,
Contractor: Peter Kiewit Sons, Inc.

 