Five Bridges , Coast Highway #1, near Big Sur CA,
USA
Tie Down Anchors: 200 Anchors, up to 9 STrands,
up to 120 ft
Owner: CALTRANS
Contractors: Malcolm Drillling Co, Inc. & Drill Tech
|
| |
Big Creek Bridge
Epoxy Coated Flo-Fill-Bond Strand Tie Down
Anchors for Seismic Retrofit: ?? Anchors, ?? Strand, ??ft
Owner: CALTRANS
Contractor: Avar Construction Systems
|
| |
Bixby Creek Bridge
Epoxy Coated Flo-Fill-Bond Strand Tie Down
Anchors for Seismic Retrofit: ?? Anchors, ?? Strand, ??ft
Owner: CALTRANS
Contractor: Hayward Baker
|
| |
Woodwardia-Fern Canyon Bridge
Epoxy Coated Flo-Fill-Bond Strand Tie Down
Anchors for Seismic Upgrade: ?? Anchors, ?? Strand, ??ft
Owner: CALTRANS
Contractor: Hayward Baker
|
| |
Two Stressed Ribbon Bridges, San Diego CA.
Epoxy Coated Flo-Fill-Bond Strand Tie Down
Anchors in Abutments: ?? Anchors, ?? Strand, ??ft
Owner: T.Y. Lin Consultants
Contractor: Wagner Construction
|
| |
Carquinez Bridge
Epoxy Coated Flo-Fill-Bond Strand Tie Down
Anchors for Seismic Upgrade: ?? Anchors, ?? Strand, ??ft
Owner: CALTRANS
Contractor: Balfour Beatty
|
| |
Golden Gate Bridge Approach, San Francisco, CA.
Tie Down Anchors for Seismic Upgrade: ??Anchors,
?? Strands, ??ft
Owner: T.Y. Lin Consultants
Contractors: Avar Construction for Balfour Beatty
|
| |
Cold Spring Canyon Arch
Bridge Foundations, CA.
Tie Back and Tie Down Anchors for Seismic Upgrade:
16 Anchors, 47 Strands
Owner: CALTRANS
Contractors: Malcolm Drilling Co, Inc.
|
|
Projects
|Dams | Retaining
Walls / Slope Stabilizations | Others
|
|