Con-Tech Systems Ltd.
Home CTS News Products Technology Service Projects Links Contact
 
Highway I-15
San Diego, California 1999

Project: Shotcrete Wall for Cut and Cover Tunnel
In difficult ground conditions, loose sand, gravel and cobles, Injection BOring is the most efficient and economical: CTS / TITAN IBO hollow bar soil nails Injections grouted CTS / TITAN IBO hollow bar soil nail
Soil nailed shotcrete wall
Project Information
Owner:
CalTrans, Sacramento, CA.

Contractor:
Wagner Construction, San Diego, CA

 

Con-Tech Systems
8150 River Road
Delta, B.C. V4G 1B5

February 28, 2001