Highway 92
between San Mateo & Half Moon Bay, CA, 1999
Project: Retaining Wall with Natural Rock Look alike Shotcrete |
||||||||||||||||||||||||||||||||||
| CTS Products |
|
|||||||||||||||||||||||||||||||||
CTS / TITAN IBO Soil Nails |
||||||||||||||||||||||||||||||||||
| The Task: Building a Retaining Wall, which blends into the environment to reduce it’s visual impact. The Problem: Very difficult ground conditions (badly weathered, decomposed and fractured rock). The Solution: Soil Nailing with CTS / Titan IBO Hollow Bars. IBO-Titan Soil nails offer a unique environment friendly way for the stabilisation of embankments, land slides and for road constructions. |
||||||||||||||||||||||||||||||||||
| Finished IBO-Titan soil nailed retaining wall section (above). The making of the wall. Nailed and cased, right, shotcrete stabilized, left. (below). |
Project Information Owner: CalTrans, Sacramento, CA Contractor: Drill Tech, Drilling & Shoring Inc., Oakley CA |
|||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||
|