Con-Tech Systems Ltd.
Home CTS News Products Technology Service Projects Links Contact

 

Cold Spring Canyon
California

Project Goal:  Seismic Retrofit and Upgrading
Cold Spring Canyon Bridge CTS Products:
16 Strand anchors, Class I corrosion protected, 48 strands/anchor

Installation Rollers

Stressing and testing equipment

CTS Services:
Technical assistance
Cold Spring Canyon Bridge (top).

Anchor head with gripper restrainer plate, after stressing (left).

Finished abutment & encapsulated anchor head (bottom).
Project Information

Owner:
CalTrans, CA

Contractor:
Malcolm DrillingCO. Inc., Irwindale, CA.
Strand Anchor head wirh gripper and restrainer plate
Finished abutment and encapsulated strand anchor head
Con-Tech Systems
8150 River Road
Delta, B.C. V4G 1B5

February 28, 2001